How much does floor stripping and waxing cost?
Your vinyl tile has gone gray in the corridors, and the quotes you have range from cheap to alarming. Here is what sits behind the per-square-foot number.
National Cleaning Group ·
Commercial floor stripping and waxing usually lands somewhere between fifty cents and three dollars a square foot, and the spread is wide for good reasons. Two buildings with the same square footage can get very different quotes because the work behind the number is different.
Start with the published ranges and the drivers behind a quote. Then the number that matters more: what a floor costs you per year, not per strip. A list for your quote request closes it out.
What published guides say it costs
Third-party cost guides put the job at roughly $0.50 to $3.00 per square foot. These are industry figures, not our rates, and they are useful only as a sanity check.
| Source (2026) | Published figure |
|---|---|
| HomeGuide | $0.50 to $3.00 per sq ft; most pros have a $250 to $500+ minimum |
| HomeGuide, vinyl composition tile (VCT) | $0.50 to $1.50 per sq ft |
| HomeGuide, terrazzo | $1.00 to $4.00 per sq ft |
| Homewyse, September 2026 national estimate | Starts at $1.74 to $2.18 per sq ft |
| Smart Janitorial, commercial strip and wax | $0.25 to $0.70 per sq ft, $0.85+ for premium work |
Two things explain the gap between the low and high figures. Contract janitorial pricing assumes a large, repeat floor on a maintenance schedule. Consumer cost sites blend in small one-off jobs where the minimum charge does most of the work. A 600-square-foot break room priced at a $400 minimum works out to about 67 cents a square foot. The same rate would never apply to 30,000 square feet of corridor.
Use the ranges like a cost calculator: to spot a quote far outside the band and ask why.
What moves the price on your floor
Labor is most of the cost, so anything that adds hours or adds a night moves the number.
| Driver | Why it changes the price | What to ask |
|---|---|---|
| Floor condition | Heavy buildup or old layers need more stripper, more passes, sometimes a second strip | How many passes do you expect, and is a second strip priced in? |
| Floor type | VCT is routine; terrazzo, stone, and sheet vinyl need different chemicals and care | Which products and pads will you use on this floor? |
| Coats of finish | Each coat is more product and more dry time | How many coats, and is a sealer coat included? |
| Furniture moves | Desks, shelving, and exam tables have to come out and go back | Who moves what, and is it in the price? |
| Layout | Open corridors go fast; small rooms and edges are hand work | Which rooms are priced as open floor and which as detail? |
| Access hours | A six-hour overnight window may split one job into three nights | How many nights, and in what order by zone? |
| Square footage | Setup is fixed, so larger jobs cost less per foot | Is there a minimum charge? |
The cost that matters is per year, not per strip
The strip is only one line in what your floors cost each year. What matters is the twelve-month spend to keep the floor looking right, and the schedule between strips sets that.
A full strip removes all the finish down to bare tile, then lays three or more fresh coats. Scrub and recoat is lighter: the crew scrubs off the top, worn layer of finish with a less aggressive pad, rinses, and lays one or two new coats. No stripper, no bare tile, fewer coats, less dry time. Burnishing is lighter still, a high-speed pass that brings the gloss back on finish that is still sound.
| Visit | What happens | Where it is commonly used | Relative cost per visit |
|---|---|---|---|
| Burnish | High-speed polish of existing finish | Lobbies, corridors, weekly or more | Lowest |
| Scrub and recoat | Remove the worn top layer, add 1 to 2 coats | Traffic lanes, every few months | Moderate, a fraction of a strip |
| Full strip and refinish | Remove all finish, rinse, apply 3+ coats | Whole floor, when recoats stop working | Highest |
Maintained this way, a floor that would otherwise need a strip every few months can often go a year or more. The strip quote may look the same either way. The yearly spend does not.
Ask for floor work as scheduled periodic lines next to the nightly janitorial scope, rather than a one-off project every time the corridor dulls. Our commercial floor care page shows how those cycles are laid out.
What goes wrong between strips (and costs you a strip early)
Most finish failures start on ordinary nights, long after the floor crew has left. The usual handover problems:
- The wrong mopping chemical. Strong alkaline cleaners and degreasers soften floor finish. If the nightly crew mops the corridor with the same product they use on the kitchen floor, the gloss fades in weeks. Nightly mopping on finished tile should use a neutral cleaner.
- Mopping too soon. Finish keeps curing after it feels dry. Heavy carts, wet mopping, or burnishing too early can scuff or haze it. The finish label states the wait; the floor crew should leave that note with your nightly crew and with you.
- No walk-off matting. Grit tracked in from the parking lot acts like sandpaper on the first 20 feet of floor. Mats at the entries do more for finish life than an extra coat.
- Chairs and carts. Bare chair legs and hard cart wheels cut lines into fresh finish. Felt glides and checked casters are cheap.
- Two vendors, no owner. If one company mops nightly and another strips twice a year, nobody owns the condition of the floor in between. Each blames the other when it dulls.
When the same contractor runs the nightly scope, any day porter hours, and the periodic floor work, the person responsible for the finish is also the person mopping it.
How long it takes, and how to schedule around your building
Most strip and refinish work happens at night or on weekends because the floor is out of use until the last coat is dry.
The sequence is fixed: move furniture, dust mop, apply stripper and let it dwell, scrub, pick up the slurry, rinse, dry, then lay coats of finish with drying time between each. Humidity changes dry times, and no crew can rush the last half of the night.
For a building that stays open on weekdays, plan by zone:
- Pick the zones (for example, east corridor, lobby, break room).
- Give each zone its own night, with a clear finish time before staff arrive.
- Agree on how traffic reroutes around wet areas and who puts the signs out.
- Walk each zone with the floor crew's supervisor the next morning, before staff fill it.
Medical suites, schools, and retail floors have their own constraints on when areas can close. Our medical office cleaning page shows how that fits around patient hours.
What to put in your floor care quote request
Copy this into your email or RFP so every bidder prices the same job:
- Floor types and approximate square footage by area (VCT corridor, sheet vinyl break room, terrazzo lobby).
- Current condition, with photos of the worst spots.
- Number of coats of finish expected after a strip, and whether a sealer coat is included.
- Who moves furniture and equipment, and what stays in place.
- The nights and hours each zone is available, and the time it must be back in use.
- How many strips, scrub-and-recoat visits, and burnishing visits per year, each as its own line.
- The neutral cleaner the nightly crew will use on finished floors.
- Minimum charge, if any, and the price for adding an area later.
Ask for each floor service priced as a separate line with a frequency. That way you can see what happens to the yearly total if you move a strip from twice a year to once and add two recoats instead. Our commercial cleaning cost guide covers how the rest of the contract is priced, and our office cleaning services page shows how floor work fits the nightly scope.
Price the year, not the strip
Bring your last two floor invoices to the walkthrough. We check each floor type and the state of the finish, and you can ask for burnishing, recoats and strips as separate lines so the twelve-month total sits next to your nightly cleaning price. Book a free facility assessment or call (202) 968-1190.
Frequently asked questions
How much should it cost to strip and wax floors?
Published 2026 guides put it around $0.50 to $3.00 per square foot, and HomeGuide notes most providers carry a minimum of $250 to $500 or more. Plain vinyl composition tile in good shape sits near the low end. Neglected floors, heavy furniture, extra coats, stone or terrazzo, and tight overnight windows push the price up.
How many hours does it take to strip and wax a floor?
It depends on crew size, area, and dry time. Stripping, scrubbing, and rinsing go fast with machines, but each coat of finish has to dry before the next one goes down, and most jobs get several coats. A single office suite often fits in one night. A large building is usually split into zones over several nights.
How often should a floor be stripped and waxed?
It depends on traffic and on what happens between strips. Entries, corridors, and break rooms wear fastest. With regular burnishing and scrub-and-recoat visits, many office floors go a year or longer between full strips. Without that maintenance, the same floor may need a strip every few months to look right.
Is scrub and recoat cheaper than stripping and waxing?
Yes, per visit. A scrub and recoat skips the stripper and the bare-tile stage, lays one or two coats instead of several, and usually fits in a shorter night. It only works while the base coats are sound. Once traffic lanes show bare tile or the finish has yellowed, a full strip is the fix, so recoats stretch the time between strips rather than replacing them.
Do you mop after stripping floors?
Yes. After the old finish is scrubbed loose and picked up, the floor is rinsed with clean water, often more than once. Stripper left on the tile keeps new finish from bonding, and the floor can peel or haze within weeks. A proper rinse is one of the steps a rushed crew skips.